Crossport Systems Pivio Manual de instrucciones Pagina 27

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 45
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 26
Left Middle/Outer 120 Foot Boom Lubrication Point Line Detail
Note: The Inner and Outer Lower Pivot Points do not provide the needed clearance to
install a fitting and lube line. The lube ports will need to be repositioned in order to
connect to these points. This is an option, covered by the steps below.
Support the Boom and remove bolt (pin). Locate new lube port position so the line will route
away from the pivot point.
Drill hole for new lubricant port
P
icture of new lubrication port
.
Tap the new port to ¼-28 thread and clean out
bushing of shavings.
Install 20026 in lube port and #223-12273-6 into
20026. Route line from Inner Lower Pivot to valve
outlet 2 and Outer Lower Pivot to valve outlet 1.
Vista de pagina 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 44 45

Comentarios a estos manuales

Sin comentarios